Dry River Bridge

A new, (3) Plate Girder Bridge which consists of 30 girders and an approximate total weight of 500 Tons. Once fabricated and coated, all 30 Girders were loaded on a barge and shipped to site from Cherubini’s waterside facility in Woodside